Dock Repair in Miami
Any dock work over tidal water in Miami-Dade starts with the county's Class I permit. A short list of repairs skips it.
Get a free match
This site is a free referral service. We are not a contractor. We connect you with licensed, insured marine contractors.
Call or text (645) 230-5980
Call now or send a text with your address and what you need.
Section 24-48 of the Code of Miami-Dade County provides for the protection of these resources by requiring that a Class I permit be obtained for all work in, on, over, or upon the tidal waters or coastal wetlands of Miami-Dade County, including those areas within municipalities.
Which repairs skip it?
Loose boards? A cleat torn out? A pile that needs a jacket? These are the dock items on the county's list:
The following is a list of projects that are exempt from a Class I Permit.
- (a) Repair and/or replacement of the decking or handrails, on an existing dock or pier, limited to their original dimensions.
- (g) The removal of old or unused or rotting piles or the removal of dilapidated docks, boatlifts, davits, or piers.
- (k) Installation, repair, or replacement of marine hardware on docks and piers necessary to secure vessels including, but not limited to, cleats, mooring whips, chocks and mooring bits.
- (l) Construction, installation, repair, or replacement of permanent uncovered benches and/or tables on docks and piers.
- (m) Construction, installation, repair, or replacement of fenders, except fender piles, on docks and piers necessary for the protection of vessels.
- (n) Construction, installation, repair, or replacement of storage boxes, not exceeding thirty-six (36) inches in height, on docks and piers.
- (o) Construction, installation, repair, replacement of ladders on docks and piers to provide access to and from vessels and/or the water.
- (p) The placement of concrete jackets or other forms of protection on existing dock, pier or mooring piles.
- (q) The replacement of fender piles or mooring piles at the same exact location as they presently exist and provided that the following criteria are adhered to:
- (i) The fender piles or mooring piles to be replaced do not protrude into the water more than twenty-five (25) percent of the width of the waterway.
- (ii) The work will be done by a contractor holding an applicable certificate of competency.
- (iii) The contractor shall contact the Director or the Director's designee a minimum of twenty-four (24) hours prior to performing the fender pile or mooring pile replacement work with information on the location and the number of fender or mooring piles to be replaced.
Decking goes back at its original size. Fender piles are cut out of item (m) and come back in (q).
When the job is bigger
When permissible, a short form permit application may be accepted by the Department of Regulatory and Economic Resources for the following types of work:
- 3. Repair, replacement or restoration of docks, piers, davits, boat lifts, mooring or fender piles, provided none of the foregoing protrude into the water more than twenty-five (25) percent of the width of the waterway.
Most short form permits are valid for 2 years from the date of issuance, while mangrove trimming permits and most standard form permits are valid for 3 years from the date of issuance.
If additional time is necessary to perform the work, the permit may be extended in 2 or 3-year increments provided the total time period of the extensions granted does not exceed 10 years.
The state and federal side
Florida's repair paragraph:
(d) The replacement or repair of existing docks and piers, except that fill material may not be used and the replacement or repaired dock or pier must be within 5 feet of the same location and no larger in size than the existing dock or pier, and no additional aquatic resources may be adversely and permanently impacted by such replacement or repair. This does not preclude the use of different construction materials or minor deviations to allow upgrades to current structural and design standards.
And the Army Corps maintenance permit, reissued January 8, 2026:
(a) The repair, rehabilitation, or replacement of any previously authorized, currently serviceable structure or fill, or of any currently serviceable structure or fill authorized by 33 CFR 330.3, provided that the structure or fill is not to be put to uses differing from those uses specified or contemplated for it in the original permit or the most recently authorized modification. Minor deviations in the structure's configuration or filled area, including those due to changes in materials, construction techniques, requirements of other regulatory agencies, or current construction codes or safety standards that are necessary to make the repair, rehabilitation, or replacement are authorized. This NWP also authorizes the removal of previously authorized structures or fills. Any stream channel modification is limited to the minimum necessary for the repair, rehabilitation, or replacement of the structure or fill; such modifications, including the removal of material from the stream channel, must be immediately adjacent to the project. This NWP also authorizes the removal of accumulated sediment and debris within, and in the immediate vicinity of, the structure or fill. This NWP also authorizes the repair, rehabilitation, or replacement of those structures or fills destroyed or damaged by storms, floods, fire or other discrete events, provided the repair, rehabilitation, or replacement is commenced, or is under contract to commence, within two years of the date of their destruction or damage. In cases of catastrophic events, such as hurricanes or tornadoes, this two-year limit may be waived by the district engineer, provided the permittee can demonstrate funding, contract, or other similar delays.
Storm damage has its own page: storm damaged dock repair. So do pilings.